From your drawing to a running cell.
We build nothing before you order — and nothing ships before it has run your parts. Every step ends with a result you can check.
- 01
Call and parts review
Send a drawing, sample parts and details about your machine or line. We ask questions and check feasibility.
- 02
3D concept and animation
A layout in your space and an animation of the cycle, so you see the cell before it exists.
- 03
Fixed quote
Specification, price, schedule and acceptance criteria — in writing.
- 0450%
Order
Design freeze. We order the robot or conveyor and long-lead parts.
- 0540%
Build and FAT
The cell is built and runs your parts in a factory acceptance test at the build partner's workshop. Live or on video.
- 0610%
Install, SAT, training
Installation at your plant, site acceptance test, training for your operators and maintenance team.
- 07
Warranty and service
Remote support, spare parts and new part families when you need them.
Payment: 50 / 40 / 10
Half on order pays for the robot and long-lead hardware. 40% follows only after the cell has passed the FAT with your parts. The last 10% is due after it runs at your plant.
Two terms we use
| FAT | Factory acceptance test — at the build partner's workshop, with your parts, before delivery. |
|---|---|
| SAT | Site acceptance test — at your plant, after installation. |
Send us a drawing or a sample part.
We reply with questions, then a 3D concept and a fixed quote. No obligation until you order.